Apr 24
Bids in
20 days

UW Stout Fryklund Hall Micheels Hall & Swanson Library Roof Replacements

Remodel
In general, the work consists of: the removal of existing spray foam and BUR systems on Fryklund Hall and Swanson Library roofs, and removal of existing ballasted EPDM roof on Micheels Hall. The installation of 3 new polyisocyanurate insulation and adhered EPDM roofing membrane system.
All Plans | 3-12-25 (click to expand/collapse)
35-24x36.
Order this section for $50.00
Name Date Size
PLANS_UW Stout Multi Bldg Roof Replace 3/12/2025 70.4 MB