Aug 7
Bid ended
CENTRAL CHILLED WATER PLANT EXPANSION OTTENSMAN HALL - UW Platteville
In general, the work consists of demolition of an existing chiller and cooling tower in Markee Pioneer Student Union. And Installation of one new 900-ton centrifugal chiller.
All Specs | 7-17-24
(click to expand/collapse)
966-8.5x11 in (3) files.
Name | Date | Size | ||
VOL#1 GPC SPEC_UWP Water Plant Exp | 7/17/2024 | 1.9 MB | ||
VOL#1 MEP SPEC_UWP Water Plant Exp | 7/17/2024 | 1.9 MB | ||
VOL#2 SPEC_UWP Water Plant Exp | 7/17/2024 | 10.7 MB |