Aug 7
Bid ended

CENTRAL CHILLED WATER PLANT EXPANSION OTTENSMAN HALL - UW Platteville

Remodel
In general, the work consists of demolition of an existing chiller and cooling tower in Markee Pioneer Student Union. And Installation of one new 900-ton centrifugal chiller.
All Specs | 7-17-24 (click to expand/collapse)
966-8.5x11 in (3) files.
Order this section for $210.00
Name Date Size
VOL#1 GPC SPEC_UWP Water Plant Exp 7/17/2024 1.9 MB
VOL#1 MEP SPEC_UWP Water Plant Exp 7/17/2024 1.9 MB
VOL#2 SPEC_UWP Water Plant Exp 7/17/2024 10.7 MB