Aug 7
Bid ended

CENTRAL CHILLED WATER PLANT EXPANSION OTTENSMAN HALL - UW Platteville

Remodel
In general, the work consists of demolition of an existing chiller and cooling tower in Markee Pioneer Student Union. And Installation of one new 900-ton centrifugal chiller.
ADD1 | 7-17-24 (click to expand/collapse)
5-8.5x11.
3-30x42.
Order this section for $15.00
This is available for download to registered users. Log in now
Name Size
19G2K-00-SD-Addendum 1 1.4 MB
ADDs 2 & 3 | 7-31-24 (click to expand/collapse)
20-8.5x11.
This is available for download to registered users. Log in now
Name Size
19G2K-00-SD-Addendum 2 MEPID 958.2 KB
19G2K-00-SD-Addendum 3 192.4 KB