May 7
Bids in
33 days

Kettle Moraine Correctional Housing Unit 7 Toilet Shower Remodel

Remodel
In general, the work consists of : The replacement of collapsed cast iron piping located under the floor slab and within walls. Replace all fixtures, upgrade lighting, ventilation, floors and walls will be retiled, replace ceiling. The new configuration will provide an accessible shower and toilet space in addition to other fixtures and layout to meet PREA requirements. The staff toilet room will be enlarged, with new fixtures and finishes. This work is located within a secure setting.
No files available