May 13
Bids in
39 days

UW Milwaukee Chemistry Building Abatement & Demolition

Demolition
In general, the work consists of: The abatement and demolition of the existing Chemistry Building. This project scope also includes demolition of the Chemistry building loading dock, and other site improvements, construction of a stone ramp for access to the site, disconnect of existing Chemistry Building utilities, construction of basement and sub-basement wall reinforcing, and backfill and compaction of fill in basement and sub-basement.
Vols 1-2 Specs | 3-20-25 (click to expand/collapse)
390-8.5x11 in 2 files.
Order this section for $65.00
Name Date Size
VOL#1 AAC SPEC_UWM Chem Bldg Demo 3/20/2025 27.2 MB
VOL#2 SPEC_UWM Chem Bldg Demo 3/20/2025 6.9 MB