UW Milwaukee Chemistry Building Abatement & Demolition
In general, the work consists of: The abatement and demolition of the existing Chemistry Building. This project scope also includes demolition of the Chemistry building loading dock, and other site improvements, construction of a stone ramp for access to the site, disconnect of existing Chemistry Building utilities, construction of basement and sub-basement wall reinforcing, and backfill and compaction of fill in basement and sub-basement.
Vols 1-2 Specs | 3-20-25
(click to expand/collapse)

390-8.5x11 in 2 files.
Name | Date | Size | ||
VOL#1 AAC SPEC_UWM Chem Bldg Demo | 3/20/2025 | 27.2 MB | ||
VOL#2 SPEC_UWM Chem Bldg Demo | 3/20/2025 | 6.9 MB |