UW Milwaukee Chemistry Building Site Restoration & Quad Construction
In general, the work consists of: The Campus Quad site restoration and quad construction will replace the existing Chemistry Building after its demolition and become a premier destination for events, gathering, studying, and passive recreation in the heart of the Southwest Quadrant of the UW Milwaukee campus. This portion of the project will include regrading, installation of grass, shrubs, and trees along with installation of sidewalks, concrete benches, underground site drainage, site fencing, artificial turf, and both concrete and brick retaining wall construction. The project also includes installation of lighting and power outlets in the campus quad area, fire hydrant relocations, storm sewer and video surveillance.