May 1
Bids in
27 days

UW Stout Sorensen Hall Fire Alarm & Protection Replacement

Remodel
In general, the work consists of: Replacing the fire alarm system and installing a new fire protection system in Sorensen Hall. Project work includes replacing the fire alarm and smoke detection system including annunciator and control panels, telecommunication cabling, pull stations, and horns/strobes with speaker devices. Additional devices will be installed in various locations as required to meet current codes and standards. The replacement system will provide signal communications to central campus reporting and a third-party entity. The project will also install a new sprinkler system and waterless fire suppression system for Network Connection room 114A that house the main campus servers, switches, and uninterruptible power supply units. The project includes the removal, installation, and replacement of ceiling finishes to access ceiling spaces for the installation of these systems.
Vols 1-2 Specs | 3-19-25 (click to expand/collapse)
538-8.5x11 in 3 files.
Order this section for $95.00
Name Date Size
VOL#1 GPC_UW Stout Sorensen Fire Replace 3/19/2025 3.2 MB
VOL#1 MEP_UW Stout Sorensen Fire Replace 3/19/2025 3.5 MB
VOL#2 SPEC_UW Stout Sorensen Fire Replace 3/19/2025 6.9 MB