Fond du lac Biosolids Drying and Renewable Natural Gas
Installation of a biosolids drying system and storage silo including a building addition to Structure 75.
Additional Docs | 3-10-25
(click to expand/collapse)

2264-8.5x11 in (8) files.
Name | Size | ||
01_Ad for Bid_FDL Biosolids | 58.2 KB | ||
02_RFB_FDL Biosolids | 276.6 KB | ||
03_Procured Equipment Shop Drawing 01 | 117.8 MB | ||
04_Procured Equipment Shop Drawing 02 | 6.5 MB | ||
05_Procured Equipment Shop Drawing 03 | 43.0 MB | ||
06_Procured Equipment Shop Drawing 04 | 56.5 MB | ||
07_Procured Equipment Shop Drawing 05 | 44.6 MB | ||
08_Procured Equipment Shop Drawing 06 | 9.8 MB |
All Specs | 3-10-25
(click to expand/collapse)

975-8.5x11.
Name | Date | Size | ||
SPECS_FDL Biosolids | 3/10/2025 | 22.4 MB |