Apr 15
Bids in
11 days
STEAM AND CONDENSATE UTILITY REPLACEMENT PITS 3 to 19 - UW Whitewater
In general, the work consists of: installation of approximately 1000 lineal feet of direct buried steam and condensate conduits and associated mechanical work within existing steam pits.
Vols 1-2 Specs | 2-25-25
(click to expand/collapse)

604-8.5x11 in (3) files.
Name | Date | Size | ||
VOL#1 GPC_UW Whitewater Utility Pits 3 to 19 | 2/25/2025 | 2.3 MB | ||
VOL#1 MEP_UW Whitewater Utility Pits 3 to 19 | 2/25/2025 | 2.5 MB | ||
VOL#2 SPEC_UW Whitewater Utility Pits 3 to 19 | 2/25/2025 | 11.3 MB |