Feb 20
Bids in
15 days

FIRE PROTECTION RETROFIT AND RENOVATION MEMORIAL LIBRARY - UW Madison

Remodel
The obsolete halon system serving the Special Collections Library will be replaced with zoned preaction systems released with aspirating smoke detection. Ceilings will be removed and restored to allow for demolition and installation of the fire suppression provided where ceilings are replaced.
All Plans | 1-14-25 (click to expand/collapse)
88-36x48.
Order this section for $395.00
Name Date Size
PLANS_UW Madison Mem Library FP 1/14/2025 145.3 MB