Mar 4
Bids in
27 days

COFRIN TECHNOLOGY AND EDUCATION CENTER - UW Green Bay

New Construction
In general, the work consists of: a new 131,000 square foot five story mixed-use building to replace the existing Cofrin Library and house multiple departments including the Library, Campus Administration, Student Success, and First Nations Education.
Vols 1-8 Specs | 1-6-25 (click to expand/collapse)
2760-8.5x11 in (10) files.
Order this section for $540.00
Name Date Size
VOL#1 AAC Spec_UWGB Cofrin Tech & Ed Ctr 1/6/2025 2.4 MB
VOL#1 GPC Spec_UWGB Cofrin Tech & Ed Ctr 1/6/2025 2.7 MB
VOL#1 MEP Spec_UWGB Cofrin Tech & Ed Ctr 1/6/2025 2.8 MB
VOL#2 Spec_UWGB Cofrin Tech & Ed Ctr 1/6/2025 12.2 MB
VOL#3 Spec_UWGB Cofrin Tech & Ed Ctr 1/6/2025 5.1 MB
VOL#4 Spec_UWGB Cofrin Tech & Ed Ctr 1/6/2025 3.0 MB
VOL#5 Spec_UWGB Cofrin Tech & Ed Ctr 1/6/2025 6.0 MB
VOL#6 Spec_UWGB Cofrin Tech & Ed Ctr 1/6/2025 4.9 MB
VOL#7 Spec_UWGB Cofrin Tech & Ed Ctr 1/6/2025 4.3 MB
VOL#8 Spec_UWGB Cofrin Tech & Ed Ctr 1/6/2025 7.1 MB