Feb 13
Bids in
8 days
SEWELL SOCIAL SCIENCES L&S 5TH FLOOR ANTHROPOLOGY LAB RENOVATION - UW Madison
In general, the work consists of interior remodeling of two (2) existing laboratory spaces to BSL-2 compliant laboratories on the 5th floor of the existing 8-floor level, 1966 addition of the Sewell Social Sciences building on the UW Madison campus.
Vols 1 & 2 Specs | 12-21-24
(click to expand/collapse)
1024-8.5x11 in (3) files.
Name | Date | Size | ||
VOL#1 GPC SPEC_Sewell Social Sciences LS 5th FLR | 12/21/2024 | 6.1 MB | ||
VOL#1 MEP SPEC_Sewell Social Sciences LS 5th FLR | 12/21/2024 | 6.1 MB | ||
VOL#2 TECH SPEC_Sewell Social Sciences LS 5th FLR | 12/21/2024 | 14.6 MB |