Jan 23
Bid ended
ROOF REPLACEMENT BUILDINGS A, B, D, G, H, AND J SAND RIDGE SECURE TREATMENT CENTER
In general, the work consists of: replacement of EPDM roofing on Buildings A, B, D, and G and their associated building connectors.
All Plans | 12-16-24
(click to expand/collapse)
36-8.5x11. (Incorrect sheet size.)
Name | Date | Size | ||
PLANS_SandRidge Multi Roof Replace | 12/16/2024 | 13.1 MB |