Jan 29
Bid ended
LABORATORY RENOVATIONS AGRICULTURAL ENGINEERING BUILDING - UW River Falls
In general, the work consists of: renovation of (4) instructional laboratory/classrooms and support spaces within the Agricultural Engineering / Agricultural Science building.
Vols 1 thru 3 Specs | 12-6-24
(click to expand/collapse)
![](/images/click.png)
1114-8.5x11 in (4) files.
Name | Date | Size | ||
VOL#1 GPC SPEC_UW River Falls Ag Lab | 12/6/2024 | 2.8 MB | ||
VOL#1 MEP SPEC_UW River Falls Ag Lab | 12/6/2024 | 3.0 MB | ||
VOL#2 SPEC_UW River Falls Ag Lab | 12/6/2024 | 2.2 MB | ||
VOL#3 SPEC_UW River Falls Ag Lab | 12/6/2024 | 4.2 MB |