Dec 19
Bids in
28 days

HEATING PLANT CONDENSATE / DEAERATOR TANK REPLACEMENT - UW Whitewater

Remodel
In general, the work consists of removal and replacement of the existing deaerator and boiler blowdown tank.
Vols 1 & 2 Specs | 11-1-24 (click to expand/collapse)
638-8.5x11 in (3) files.
Order this section for $140.00
Name Date Size
VOL#1 GPC SPEC_UW Whitewater Heating Plant 11/1/2024 2.7 MB
VOL#1 MEP SPEC_UW Whitewater Heating Plant 11/1/2024 2.4 MB
VOL#2 SPEC_UW Whitewater Heating Plant 11/1/2024 6.8 MB