Dec 19
Bids in
28 days
HEATING PLANT CONDENSATE / DEAERATOR TANK REPLACEMENT - UW Whitewater
In general, the work consists of removal and replacement of the existing deaerator and boiler blowdown tank.
Vols 1 & 2 Specs | 11-1-24
(click to expand/collapse)
638-8.5x11 in (3) files.
Name | Date | Size | ||
VOL#1 GPC SPEC_UW Whitewater Heating Plant | 11/1/2024 | 2.7 MB | ||
VOL#1 MEP SPEC_UW Whitewater Heating Plant | 11/1/2024 | 2.4 MB | ||
VOL#2 SPEC_UW Whitewater Heating Plant | 11/1/2024 | 6.8 MB |