Nov 21
Bids at
9:00 am

Oakfield WWTF

New Construction
New influent structure and equipment, chemical feed and electrical building, blowers, influent pumps, and aeration equipment. The aerations basin will have new aeration equipment and demolition of existing rectangular clarifier. Construction and installation of two new final clarifiers. New concrete wet well structures, and new steel bolted sludge storage tank. Upgrades to the disinfection chamber to include UV disinfection, reaeration, and non-potable water system.
ADD1 | updated 11-7-24 (click to expand/collapse)
24-8.5x11 & 13-11x17.
Order this section for $15.00
This is available for download to registered users. Log in now
Name Size
9365679a1 8.8 MB
ADD2 | 11-18-24 (click to expand/collapse)
58-8.5x11 & 3-11x17.
Order this section for $15.00
This is available for download to registered users. Log in now
Name Size
Add#2_OakfieldWWTF 8.7 MB