Public Projects

Bids Due tomorrow at 2:00pm
4/3/25 2:00pm
BRILLION WWTF
Bids Due tomorrow at 2:00pm
C.D. Smith Construction
Brillion WI.
Remodel
Construction of modifications and improvements to the existing Main Lift Station and Wastewater Treatment Facility, complete and operational for the City of Brillion, Wisconsin.
Bids Due in 6 days
4/8/25 1:00pm
Fond du lac Biosolids Drying and Renewable Natural Gas
Bids Due in 6 days
C.D. Smith Construction
Fond du Lac WI.
Addition
Installation of a biosolids drying system and storage silo including a building addition to Structure 75.
Bids Due in 6 days
4/8/25 1:00pm
MSTC - Wisconsin Rapids - A Building - Oral Health Remodel
Bids Due in 6 days
Somerville Inc
Wisconsin Rapids, WI 54494.
Remodel
The project to be bid consists of remodeling approximately 5,200 sq.ft. of interior space in Building A. Work includes General Construction, HVAC, Plumbing, and Electrical.
Bids Due in 6 days
4/8/25 1:00pm
New London Library - Rebid
Bids Due in 6 days
Keller, Inc.
New London WI
Remodel
Library Renovation Project for a 2-story remodel.
Bids Due in 8 days
Sub Bid: 3/27/25 1:00pm
Bid: 4/10/25 1:00pm
CHEMISTRY STOCKROOM RENOVATION HALSEY SCIENCE CENTER - UWOshkosh
Bids Due in 8 days
State of WI, Department of Administration, Division of State Facilities
Oshkosh WI.
Remodel
n general, the work consists of: replacing all chemical storage cabinets, exhaust ductwork and fans for the ventilated cabinets, fume hoods and utility fixtures, work counters, base cabinets, and sinks. (Continued in Spec Book.)
Bids Due in 8 days
4/10/25 2:00pm
YMCA Camp Manitou Dining Hall New Construction
Bids Due in 8 days
Market & Johnson - Eau Claire
27960 137th St - New Auburn, WI 54757
New Construction
The YMCA Camp Manitou Dining Hall Project is a new building replacing their existing dining hall at their New Auburn, WI property. This new construction will take place AFTER the 2025 camp season. Construction will begin in August of 2025 and be substantially complete May of 2026. The building is 15,391 GSF primarily of wood framed construction with a CMU/hollowcore plank storm shelter component to it. In addition to dining hall and kitchen space the finished area will also include some new sleeping units, washrooms, and a club room.
Bids Due in 13 days
Sub Bid: 4/1/25 1:00pm
Bid: 4/15/25 1:00pm
STEAM AND CONDENSATE UTILITY REPLACEMENT PITS 3 to 19 - UW Whitewater
Bids Due in 13 days
State of WI, Department of Administration, Division of State Facilities
Whitewater WI.
New Construction
In general, the work consists of: installation of approximately 1000 lineal feet of direct buried steam and condensate conduits and associated mechanical work within existing steam pits.
Bids Due in 13 days
4/15/25 2:00pm
Token Creek Park Storage Building
Bids Due in 13 days
Dane County Public Works
6200 Williamsburg Way, Deforest, WI
New Construction
New Construction of a 30ft by 50ft post framed metal storage building, electrical and plumbing work included.
Bids Due in 14 days
Sub Bid: 4/2/25 1:00pm
Bid: 4/16/25 1:00pm
REPLACE RANGER STATION GRANTSBURG STATION
Bids Due in 14 days
State of WI, Department of Administration, Division of State Facilities
Grantsburg WI.
New Construction
In general, the work consists of: replacing the existing Grantsburg Ranger Station with a new station at its current location. The new station will also replace the existing DNR office building at the property.
Bids Due in 14 days
4/16/25 1:00pm
UW Milwaukee Services Building Roof Replacement
Bids Due in 14 days
State of WI, Department of Administration, Division of State Facilities
Milwaukee WI.
Remodel
In general, the work consists of: The project will overlay the existing trapezoidal standing seam panels on 12 Roof Areas of the facility. The roof system will consist of existing trapezoidal standing seam panel, 3" EPS insulation cut to fit between ribs, 1.5" polyisocyanurate insulation, 5/8" Gypsum coverboard mechanically attached, 60-mil fully adhered EPDM single ply membrane. Tapered polyisocyanurate insulation and fully adhered 60-mil EPDM to be laid into existing internal gutters / roof drains. Installation of perimeter sheet metal flashings and roof edge gutter system to be included on the high bays. Installation of roof access and walk pads across the facility.