BATHROOM REMODELS MULTI-BUILDING LINCOLN HILLS SCHOOL
Status
Accepting Bids
Prebid Date | 11/12/24 10:00am |
Bid Date | 12/3/24 1:00pm |
Company & Contacts
Location
Irma WI.
Please Submit Bids to The OWNER as indicated in the Spec Manual.
DESCRIPTION: In general, the work consists of: the remodeling of bathrooms within two (2) housing units. This work will include reworking of CMU walls to accommodate new detention grade toilet and shower fixtures, new floor, wall and ceiling finishes. HVAC work is limited to the replacement of grilles, diffusers and covers. Work by Owner will include all electrical work (Division 26-28), new toilet and shower modesty partitions, swing doors and lighting fixtures. This work is located within a secure facility.
PRE-BID CONFERENCE: A non-mandatory pre-bid tour is scheduled for 10:00 a.m. November 12, 2024, at the project site. It is encouraged that contractors attend. Attendees will require a background check per DOC Contractor Site Access and Working Requirements included within. Please email Quentin Trevino, B&G Supervisor quentin.trevino@wisconsin.gov and Jessica Erickson, jessica.erickson@wisconsin.gov a minimum of 48 business hours prior to meeting to be included on the list of attendees. Bidders, please meet at the main entry. Please contact Eva Allen, KONTEXT architects, llc eva@kontextarchitects.com for additional information.
• It is the bidder’s sole responsibility to review the “Addenda” tab during the bidding process for new postings!
• The Owner, Architect, General Contractor, Printer, or PlanRoom will not be responsible for bids or sub-bids based on single drawings, specification sheets or observation or use of partial sets of documents. It is the bidder’s sole responsibility to review & understand all project requirements prior to submitting a bid!
Planroom Help? eMail support@blueprintfdl.com or call 920-922-3592.