REPLACE RANGER STATION GRANTSBURG STATION
Status
Accepting Bids
Prebid Date | 3/17/25 1:00pm |
Sub Bid Date | 4/2/25 1:00pm |
Bid Date | 4/16/25 1:00pm |
Company & Contacts
Location
Grantsburg WI.
Please Submit Bids to The OWNER as indicated in the Spec Manual.
DESCRIPTION: In general, the work consists of: replacing the existing Grantsburg Ranger Station with a new station at its current location. The new station will also replace the existing DNR office building at the property. The new fire response facility will include office space for 8 FTE employees and 4 LTE employees. In addition, it will include a heated approximately 5-bay drive-thru garage for one Type 6 engine, two Type 8 engines, and three Type 4 engines with attached trailer that carry 2 tractor/plow units and one low ground unit. The heated area will contain workspace for woodworking/small projects and fire cache. The fire response facility will also contain an unheated 1-bay drive-thru garage for storage of one forestry light trucks, mobile fire cache trailer, and Conservation Warden light truck. Additional storage space within the unheated drive-thru will be included.
PRE-BID CONFERENCE: A non-mandatory pre-bid tour is scheduled for Monday, March 17, 2025, 1:00 pm at the Ranger Station 325 WI-70, Grantsburg. It is encouraged that contractors attend. Please contact Brandee Lian, LHB Project Manager, 218.213.1959, Brandee.Lian@LHBcorp.com for additional information.
• It is the bidder’s sole responsibility to review the “Addenda” tab during the bidding process for new postings!
• The Owner, Architect, General Contractor, Printer, or PlanRoom will not be responsible for bids or sub-bids based on single drawings, specification sheets or observation or use of partial sets of documents. It is the bidder’s sole responsibility to review & understand all project requirements prior to submitting a bid!
Planroom Help? eMail support@blueprintfdl.com or call 920-922-3592.